Self Assessment Tool Development
Transforming Digital Tools for CHIs
Process phases
-
12021-05-10 - 2021-06-10
Content and Question Development
Partners will revise the survey questions along with developing feedback for each question according to the experience and language of the survey participant. Additionally, an analysis of various online surveys, their features, and models for gamification will be analysed for user interface design.
-
22021-06-14 - 2021-11-14
Prototyping
Several different prototypes and experiments will be carried out to test the riskier assumptions within the tool as well as the accessibility, usability, and relevance of the content.
-
32021-11-15 - 2021-12-15
Testing Period 1
This phase will test the initial design of the self assessment tool with available decidim techonologies.
-
42022-02-01 - 2022-05-24
Developing New Decidim Features
This period will be to develop additional features for the survey that have been determined as necessary for the functioning of the assessment tool.
-
52022-06-01 - 2022-09-06
Development Period 2. Envisioning SAT full pack release
The second iteration of testing the survey with newly developed features and interface possibilities such as live response and improvments of recomendations results page